Client Project Scope Supply Performance
WOOJIN Electric Machinery Co., Ltd.

Jinjeop Line Depot – Pantograph wear Measurement & Train Roof Monitoring System

Nov-2025
KORAIL

Wayside Train Pantograph Inspection System(Phase 3)

Oct-2025
KORAIL

Wayside Train Pantograph Inspection System(Phase 2)

Oct-2024
KORAIL

Wayside Train Pantograph Inspection System(Phase 1)

Oct-2023
KORAIL

Wayside Signaling Equipment On-Board Inspection System

Oct-2023
KORAIL

Sleeper Defect/Fastener Detachment Inspection Device

Oct-2023
KORAIL

Track Facilities Deformation Inspection Device

Oct-2023
KORAIL

On-Board Overhead Contact Line Facilities Inspection System

Oct-2023
KORAIL

Automatic Overhead Contact Line Inspection System – Renovation

Jan-2023
DAWONSYS

Track Facilities Inspection Device (Seoul Metro Line 4)

May-2024
KORAIL

Wayside Signaling Equipment On-Board Inspection System

Jun-2023
KORAIL

Track Video Surveillance Device

Jun-2023
KORAIL

Track Facilities Deformation Inspection Device

Jun-2023
KORAIL

On-Board Overhead Contact Line Facilities Inspection System for Commercial Train

Jun-2023
Taiwan Railways Administration (TRA)

Axle Temperature & Pantograph Automatic Inspection System – 11 Sets

Dec-2021
KORAIL

Sleeper Defect/Fastener Detachment Inspection Device

Feb-2021
KORAIL

Track Facilities Deformation Inspection Device

Feb-2021
KORAIL

Track Video Surveillance Device

Feb-2021
KORAIL

Laser Measurement Device

Jan-2024
KORAIL

Conventional Line On-Board Overhead Contact Line Facilities Inspection System

Jan-2021